BCI Case Study: College Square Shopping Center
Project Size: One story supermarket, 55,164 SF with two
adjacent strip retail shell buildings, 26,229 SF Total project = 81,393 SF
Site: Approximately 9,435 acre site, located in Westminster, Carroll
County, Maryland.
Schedule: October 1 - June 30, 1999.
Outline Specifications
Site: Clearing, grading, installing temporary sediment control
devices, site utilities, roadways, paved parking, curbs, sidewalks, equipment
pads and landscaping.
Foundation: Concrete footings, curb, piers, precast concrete
lintels.
Superstructure: Structural steel framing, canopies framed with
prefabricated metal stud trusses.
Facade: Exterior Insulation Finish System (EIFS), fiberglass batts at
exterior walls, canopies pre-finished standing seam metal panels.
Roof: Roofing comprised of metal fiber shingles on roofing felts over
plywood sheathing, built-up roofing over rigid insulation.
Finishes: Vinyl tile flooring, acoustical tile ceilings, painted
gypsum board demising partitions.
Fire Protection: Protected by a hydraulically designed automatic wet
pipe fire suppression sprinkler system, fire alarms, fire extinguisher, dry pipe
sprinkler system.
Plumbing: Domestic water, sanitary sewer and natural gas, 100-gallon
capacity hot water tank,30 gallon and 6 gallon capacity electric water
heaters.
HVAC: Gas-fired unit heaters, 4 rooftop gas/electric HVAC, gas-fired
unit heaters.
Electrical: Proposed transformer with 3000 amperes, 208/120V, 3 phase,
4 wire for the Supermarket. The retail strip will have a transformer with 1200
amperes, 208/120V, 3-phase, 4-wire.
Project Hard Cost Synopsis
| |
Cost |
|
Cost/SF |
| General Conditions |
$239,780 |
or |
2.95 |
| Sitework |
1,722,970 |
or |
21.17 |
| Concrete |
348,400 |
or |
4.28 |
| Masonry |
391,500 |
or |
4.81 |
| Steel |
375,000 |
or |
4.61 |
| Carpentry |
117,500 |
or |
1.44 |
| Roofing |
329,500 |
or |
4.05 |
| Insulation/EIFS |
8,000 |
or |
0.10 |
| Glass and Storefront |
68,600 |
or |
0.84 |
| Doors |
81,900 |
or |
1.01 |
| Drywall |
447,000 |
or |
5.49 |
| Painting |
26,750 |
or |
0.33 |
| Ceramic and Spec. Floor |
29,300 |
or |
0.36 |
| VCT and Base |
49,900 |
or |
0.61 |
| Acoustical Ceilings |
119,000 |
or |
1.46 |
| Plumbing |
253,800 |
or |
3.12 |
| Sprinkler |
76,000 |
or |
0.93 |
| HVAC |
310,100 |
or |
3.81 |
| Electrical |
510,000 |
or |
6.27 |
|
Total |
$5,505,000 |
|